SERVICES OFFERED:
Floors
Standard Service: Provide and install Bonder product. Check for potential leaks. Additional Service: Provide and install a Sealer.
TYPICAL PROJECT TIMETABLE
Radiant Floor
2,000 sq ft area
2 hour setup
1 hour pour
2 hour breakdown/cleanup
Ready to walk on the following morning
JOB REQUIREMENTS / SPECS
Floors to be broom clean. Major penetrations sealed against water leakage. Subfloors must be structurally sound with a minimum deflection rate of L/360. Floors will be loaded with 15 lbs/sq ft with installed 1-1/2" product. 10 to 15 gallons of water per minute required on site. Trash container for cleanup. Setup site [50' X 50'] within 50 feet of the building over unfinished grade with road access to site.
Radiant Heat pipe filled with fluid and pressure tested complete and installed per product specification.
|
|
|
|
|
PRODUCTS OFFERED:
Firm-Fill ® High Strength
Firm-Fill ® 4010
Firm Fill ® 2010
Gyp-Span® Radiant
|
|